In connection with the construction of the fairway between the Port of the Nowy Swiat and the mouth of the Elblag River, nourishing pipeline were laid between the fairway and island formed after construction the Nowy Swiat Harbour. All nearby navigating vessels should report to the Nowy Swiat Harbor Master (CH-68 VHF) and Port Elblag Harbor Master (CH-10 VHF).