WIND FARM UNDER CONSTRUCTION 1. Construction of the Inch Cape Offshore Wind Farm will commence mid 2025. The main Wind Farm Array work area will be marked by light-buoys in the following planned positions: Buoy Type Designation Light Characteristic Position North Cardinal N1 Q 56°35.898N 002°09.454W Special Mark SM1 Fl.Y.5s 56°32.676N 002°08.879W Special Mark SM2 Fl.Y.5s 56°29.006N 002°09.168W East Cardinal E1 VQ(3)5s 56°27.639N 002°02.224W Special Mark SM3 Fl.Y.5s 56°25.945N 002°04.132W South Cardinal S1 Q(6)+LFl.15s 56°24.897N 002°07.921W South Cardinal S2 VQ(6)+LFl.10s 56°25.095N 002°14.005W Special Mark SM4 Fl.Y.5s 56°27.500N 002°16.919W West Cardinal W1 VQ(9)10s 56°30.287N 002°18.003W Special Mark SM5 Fl.Y.5s 56°32.889N 002°17.006W Special Mark SM6 Fl.Y.5s 56°35.061N 002°15.198W 2. All vessels should navigate with caution in the area. A safety zone of 500 metres becomes operational around the turbines under construction. 3. Cable laying operations will be conducted between the new wind farm and a site W of Cockenzie 55°58.077N 002°58.536W. 4. ENCs will be updated when full details are available.