DREDGED CHANNEL- The dredged channel was last maintained to the dredged depth in August 2024. Due to excessive siltation, depths in the dredged channel may be less than charted. Least depth and maximum permissible draught are regularly updated through draught charts available in the Payra Port Authority website (www.ppa.gov.bd). Anchoring and stopping within the dredged channel is prohibited.